Superglass roof shingle instructions.
How to fix felt roof shingles.
Allow a 1 2mm gap between each.
Nail above each slot between tabs 10 15mm above the end of the slot.
Next fix what is commonly referred to in north america as 30 pound felt paper or tar paper and this side of the pond as roofing underlay.
The shingles are fixed to the roof boards or insulation boards if you have chosen the roof insulation option with clout nails.
In warm weather the bonding strip will seal within hours.
Square 4 tab 2 61m2.
The tools you will need are a hammer and a sharp knife for trimming.
Supaflex felt roof shingles.
How to fix a bubble in a roof shingle.
Apply felt lap adhesive onto the detail strip then overlay the roofing tile shingles cut to the verge edge.
This layer will create a watertight barrier.
3 shingles make up each 1 metre shingle strip.
Nail the shingle 10 15mm in from the edge.
Chipmunk log cabins these felt shingles or ones similar are used in the uk on garden buildings and log cabins etc.
Nail the shingles centre line at verge to fully secure shingles in place.
The bottom of the tabs must be flush with the edge of the eaves.
You will find some small diagrams on the packs themselves but using our knowledge of working with roof shingles we have gone into a bit more depth to try and help you.
Water buildup combined with heat.
Here are the instructions for fitting the 2 most popular designs of felt roof shingles.
This is where our industry in based and.
The underlay will only last approximately six months or less if left exposed to the elements.
Ensure the first shingle is flush with the verge edge of the roof.
Step 9 mark out and unroll the detail strip along the ridge line secure by nailing edge at 10cm centres using 20mm galvanised clout nails.
Flat roofs often require more maintenance than pitched roofs because the water and debris don t roll off the roof as easily.
Butt the next bitumen roof shingle to the first locating the tongue and groove.
Armourshield mosaic roof shingle instructions.