Use our concrete slabs calculator or estimator as a guide for how much concrete mix you need for your project.
Calculate volumes for concrete slabs walls footers columns steps curbs and gutters.
To use the concrete wall calculator simply enter the width length and thickness of your pour.
For a 10 depth the slope will extend within 5 of the edge of the excavation.
Click the button to calculate the volume of concrete and man hours not including mixing needed for this job.
The amount given as needed does not include any waste.
A 1 2 1 slope means the excavation must be sloped 1 2 unit for each 1 unit of depth.
Input length and width of the area.
1 measure the length of the dike wall in feet a in the formula.
The calculator will automatically estimate the number of cubic yards of concrete that will be required.
Enter dimensions in us units inches or feet or metric units centimeters or meters of your concrete structure to get the cubic yards value of the amount of concrete you will need to make this structure.
Concrete is ordered by volume in cubic yards.
This concrete calculator will help you in estimating the amount of concrete needed for your project.
All concrete is estimated in cubic yards one cubic yard 27 cubic feet.
For large concrete jobs four cubic yards or more the concrete should be delivered by a ready mix truck.
To find the area of the face of the wall i drew a horizontal line across the wall to divide the face into a rectangle and a triangle.
Click the button to calculate the volume of concrete and man hours not including mixing needed for this job.
How do i calculate the volume of my containment dike.
Remember all values should be computed in m.
Here is my sketch of your wall not to scale.
Calculation of volume of concrete for the column.
One tank in the diked area note that the length width and height of the dike must be measured on the inside not the outside of the dike.
Input length width and depth of the area.
Calculating wall studs drywall ready mix tape joint compound nails screws.
The volume of concrete area of rectangle x depth.
The volume of concrete needed is the area of the face of the wall times its thickness of 12 inches.
Calculate volume of square slab calculator use.
Calculate the volume in cubic feet l x w x d of the area for which you need fill material.
Area of rectangle length x breadth the volume of concrete length x breadth x depth 6x5x0 15 4 5m 3 hence 4 5m 3 of concrete is required to build an above slab.